Project Development & Documentation (PDD) focuses on the integration and documentation of building systems, material selection, and material assemblies into a project. Candidates should demonstrate an understanding of and ability to integrate civil, structural, mechanical, electrical, plumbing, and specialty systems into the overall project design and documentation.

Passed
10/31/22

Study recommendations

  • The exam is 4 hours and 5 minutes long and contains 100 questions.
  • The exam is mostly multiple choice, with about 20% drag-and-place, hotspot, and calculation questions.
  • Spend 2 hours on the first 80 standalone questions, take a break, and then spend the next 2 hours on the two case studies.
  • Study building details, MEP systems, and structural systems.

Exam contents (you must know)

01

Integration of Building Materials & Systems

Mechanical Systems

  • All-air systems: Variable Air Volume and Constant Air Volume.
  • All-water systems: fan coil terminals and hydronic convectors.
  • Know supply and exhaust symbols on reflected ceiling plans.

Plumbing Systems

  • A soil stack carries blackwater; a waste stack carries graywater.
  • A vent stack connects to a stack vent; a stack vent exhausts sewage gas.
  • Pipe insulation is needed for hot water to save energy and for cold water to avoid freezing.

Electrical Systems

  • Single phase: 120/240V, 3 wires, residential.
  • Three phase: 208/400V or 277/480V, 4 wires, commercial and industrial.

Lighting Systems

  • Direct, semi-direct, direct-indirect, semi-indirect, indirect, and diffuse.
  • Know Color Rendering Index, color temperature, light distribution curves, and spectral distribution charts.

Structural Systems

  • Know steel angles, channels, plates, tees, wide-flange sections, and hollow sections.
  • Know tension, compression, shear, and movement.
  • Concrete usually needs reinforcement on the tension side with rebar.

Conveying Systems

  • Hydraulic vs. traction elevators; geared vs. gearless elevators.

02

Construction Documentation

Masonry Details

  • Study parapet, opening, and base conditions.
  • Know weep holes, mortar nets, drips, lintels, bond beams, and air spaces.

Flashing Details

  • Flashing is often required at ridges, valleys, openings, intersections, and joints.

Fire-Rated Wall Assemblies

  • Know one-hour, two-hour, and shaft-wall assemblies with gypsum boards or panels.

Door Swing

  • Right Hand (RH), Right Hand Reverse (RHR), Left Hand (LH), and Left Hand Reverse (LHR).

Moisture Protection

  • Air barrier vs. vapor retarder; a vapor retarder is usually placed on the warmer side.
  • Dampproofing controls moisture only; waterproofing controls moisture and water subject to hydrostatic pressure.

Galvanic Corrosion

  • Place similar metals together.
  • Anodic (-): zinc, aluminum, steel, lead, copper, bronze, stainless steel, silver, and gold (+) cathodic.

Design Changes

  • Understand how changes affect different building systems; for example, a deeper duct will lower the ceiling height.

03

Project Manual & Specifications

Project Manual

  • Includes bidding requirements, contract forms, conditions of the contract, and specifications.

Bidding Documents

  • Include the project manual, contract drawings, addenda, and modifications.

Specifications

  • Know the MasterFormat divisions required for a particular scope.
  • Four methods of specifying: proprietary, descriptive, performance, and reference standard.

04

Codes & Regulations

Types of Construction

  • Noncombustible: Types I and II.
  • Combustible: Types III, IV (heavy timber), and V.

Separation of Occupancies

  • IBC Table 508.4.

Egress

  • Dead end: 20 feet maximum for business occupancy.
  • Maximum common path of egress travel vs. maximum travel distance.
  • Separation of exits: one-half or one-third of the diagonal.

Accessibility

  • Ramp: 30-inch maximum rise, 1:12 maximum slope, and 60-inch minimum landing length.
  • Transition: 1/4-inch maximum height; 1/2-inch height is allowed with a bevel.
  • Wheelchair turning space: 60-inch minimum diameter circle.
  • Door maneuvering clearances for a front approach: 12 inches minimum on the push side and 18 inches minimum on the pull side.

05

Construction Cost Estimates

Cost Estimating

  • Calculate cost savings for alternative materials using the given unit price.
  • Select the most cost-effective material that meets the design standard.

Reference diagrams

Accessible door maneuvering clearance diagrams
Door Maneuvering Clearances
Parapet and roof flashing detail
Parapet and Roof Detail
Right-hand and left-hand door swing diagram
Door Handing
Plumbing stack vent and drain diagram
Plumbing Stacks
Galvanic series from anodic to cathodic metals
Galvanic Series
Diagram showing the organization of bidding and contract documents
Project Manual and Contract Documents
Common structural steel shapes
Structural Steel Shapes
Polar light distribution curve
Light Distribution Curve
IBC required separation of occupancies table
Separation of Occupancies