Skip to content
JOEY XU
Menu
Back to ARE 5.0

Division 01 · PcM

Practice Management

Practice Management (PcM) focuses on the management of architectural practice, including professional ethics, fiduciary responsibilities, and the regulations governing the practice of architecture. Candidates must demonstrate an understanding of business structure, business development, and asset development and protection.

Passed
03/11/22

Study recommendations

  • The exam is 2 hours and 40 minutes long and contains 65 questions.
  • Most questions are multiple-choice (choose one of four answers), with a minimal number of drag-and-place and hotspot questions.
  • Two case studies usually ask how to assign the best employee or team based on the project requirements. Allocate at least one hour for the case studies.
  • The exam does not require you to memorize all AIA contracts or detailed definitions of accounting terms.
  • Some calculation questions are difficult; skip any that take more than eight minutes.
  • Remember that every question is worth one point, regardless of difficulty. Plan your time carefully and do not spend too much time on any single question.

Exam contents (you must know)

01

Business Operations

Hiring and Employment

  • Employment contracts might include noncompete and no-moonlighting clauses.
  • Employment at will: no contract; the employee or employer may terminate employment without providing a reason.
  • Contractors: relationship control, financial control, and behavioral control.

Business Regulations

  • Civil Rights Act, Wage and Fair Labor Standards Act, Family and Medical Leave Act, ADA, OSHA, etc.
  • Employers withhold income tax, Social Security, and Medicare from employees’ income and remit them to the IRS.
  • A/E firms generally need to carry professional liability, commercial general liability, commercial auto, and workers’ compensation insurance.

NCARB Code of Conduct and AIA Ethical Standards

  • Read and evaluate questions using common sense.
  • For example, do not practice in another state without that state’s registration. Always give collaborators credit.

Standard of Care

  • Architects should always avoid stating “highest standard” or “best quality” in contracts.
  • Warranties or guarantees of construction, budget, or performance are not insurable.

02

Finances, Risk & Development of Business

Financial Well-Being

  • Overhead rate, utilization rate, billing rate, and multiplier.
  • Balance sheet and profit and loss statement.

Risk

  • Associated factors: client, delivery, project, schedule, and cost.
  • Research the client’s expectations, reputation, and available funding. Establish basic services in the contract. Communicate clearly with the client about scope and budget.
  • Carry professional liability insurance and maintain the standard of care.
  • Assign competent staff to tasks. Junior staff need to be under the project manager’s direct supervision.

Quality Assurance / Quality Control Process

  • Skim through the relevant AHPP sections.

03

Practice-Wide Delivery of Services

AIA B101

  • Architect’s responsibilities, owner’s responsibilities, and contractor’s responsibilities.

Project Delivery

  • Design–Bid–Build, Design–Negotiate–Build, Design–Build, Construction Manager as Adviser, Construction Manager as Constructor, Integrated Project Delivery, Bridging, and Design-Assist.
  • Stipulated Sum, Cost Plus Fee (with and without a Guaranteed Maximum Price), and Unit Price.

Defense of Claims

  • Betterment, statute of limitations, and statute of repose.

04

Practice Methodologies

Business Organization

  • Sole Proprietorship, Partnership, Limited Liability Company, Limited Liability Partnership, S Corporation, and C Corporation.
  • Understand the advantages and disadvantages of each type.

Practice Methodology

  • Efficiency-Based, Experience-Based, and Expertise-Based.
  • Horizontal (departmental) organization versus vertical (studio) organization.