Skip to content
JOEY XU
Menu
Back to ARE 5.0

Division 03 · PA

Programming & Analysis

Programming & Analysis (PA) focuses on evaluating project requirements, constraints, and opportunities. Candidates should demonstrate an understanding of project-type analysis, the establishment of qualitative and quantitative project requirements, the evaluation of project sites and context, and the assessment of economic issues.

Passed
11/15/21

Study recommendations

  • The exam is 3 hours long and contains 75 questions.
  • There are fewer multiple-choice questions than expected and many drag-and-place, hotspot, calculation, and case-study questions. Plan your time carefully and do not spend too much time on any single question.
  • The two case studies take longer because you must read scenarios and analyze reports to determine the correct answers. Allocate at least 1 hour and 15 minutes for the case studies.
  • The exam focuses on general programming and analysis knowledge, so do not spend too much time memorizing specific code requirements, such as IBC 1511.2 structural and construction loads.
  • History, urban planning, and structural concepts are rarely tested.

Exam contents (you must know)

01

Environmental & Contextual Conditions

Orientation and Wind

  • Orient the building within 15 degrees east or west of south.
  • Always seek strategies to shield the building from wind.
  • The entry should be located on the south side.

Sun Angle

  • Solstice and equinox.
  • Understand shadows at different times of day.

Noise Mitigation

  • Trees.
  • Berms.
  • Walls near highways.

Design for Different Climates

  • Cold: use a compact form, orient south, use trees to block wind, use dark-colored surface materials, and use high thermal mass.
  • Temperate: orient the long façade south, use medium-colored surfaces, and use deciduous trees on the south side to block summer sun.
  • Hot Arid: use light colors and high thermal mass, shade openings, and use evaporative cooling.
  • Hot Humid: use high ceilings, ventilation, a thin slab form, light colors, and low thermal mass.

Topographic Map

  • Identify drainage patterns and other site features.
  • Identify the best location for a building.

Bearing Capacity

  • Bedrock > gravel > sand > silt > clay.

ALTA Survey vs. USGS Map

  • Easements, contours, and site features.

02

Codes & Regulations

Zoning Regulations

  • Variance, exception, planned unit development, and amendment.
  • Setbacks, maximum height, loading and parking quantities, and landscaping.

Occupancy Types

  • Assembly (A), Business (B), Educational (E), Factory (F), High Hazard (H), Institutional (I), Mercantile (M), Residential (R), Storage (S), and Miscellaneous (U).

Exit Requirements for a Room or Space

  • 1–49 occupants require 1 exit.
  • 50–500 occupants require 2 exits.
  • 501–1,000 occupants require 3 exits.
  • 1,001 or more occupants require a minimum of 4 exits.

ADA Requirements

  • Ramp slope: 1:12 maximum; rise: 30 inches maximum; run: 30 feet maximum.
  • Width: 36 inches minimum.
  • Turning space: 60 by 60 inches minimum.
  • Handrail: 34–38 inches mounting height; 4.5 inches maximum projection.
  • Door clear width: 32 inches minimum.
  • Cane detection zone: provide a 27-inch-high rail when the clear height is less than 80 inches.

Department of the Interior’s Standards for Rehabilitation

  • Preservation.
  • Rehabilitation.
  • Restoration.
  • Reconstruction.

03

Site Analysis & Programming

Environmental Site Assessment

  • Phase I: general conditions, site history, and site findings.
  • Phase II: laboratory results focused on specific areas.

Asbestos Treatment

  • Know the locations where asbestos might be present.

Brownfield Remediation

  • Solidification, soil vapor extraction, bioremediation, soil washing, incineration, solvent extraction, dechlorination, phytoremediation, air sparging, and passive treatment wells.

Wetland and Waterbody Setbacks

  • A 50-foot minimum setback is typical.
  • Check the flood zone; the 100-year floodplain is typical.

Stormwater Management

  • Detention basin: temporarily detains water for infiltration.
  • Infiltration basin: infiltrates soil and recharges the water table.
  • Retention basin: a wet pond that retains water.
  • Rain garden: integrated with the landscape for rapid drainage and infiltration.

Foundation Issues

  • Hydrostatic pressure.
  • High groundwater table.
  • Soil liquefaction.
  • Settlement caused by low bearing capacity.

04

Building Analysis & Programming

Bubble Diagram / Adjacency Matrix

  • The exam provides descriptions of spaces, and you move the spaces into circles or boxes.

Acoustic Performance

  • Reverberation time, Sound Transmission Class, materials, and program layout.

View Analysis

  • Clients may want views of mountains, trees, rocks, etc.
  • Use trees and topography to block unwanted views when necessary.

Sustainability

  • Use permeable pavement, ponds, swales, green roofs, etc. to control stormwater runoff.
  • Balance cut and fill and avoid building on steep slopes.
  • Reduce the heat-island effect by using high-reflectivity materials.

Phases of a Project

  • When expansion is needed, consider expansibility, convertibility, and versatility.
  • Consider different scheduling types.

Cost Calculation / Unit Conversion

  • Given an area in square feet or a volume in cubic feet, calculate the cost.
  • 1 square yard = 9 square feet.
  • 1 cubic yard = 27 cubic feet.

Reference diagrams

Building setback from a property line
Property-Line Setback
Accessible reach range diagram
Accessible Reach Range
Programming adjacency diagram showing direct connections and proximity
Programming Adjacency Diagram
Comparison of detention and retention basins
Detention and Retention Basins
Common foundation types
Common Foundation Types
Trees used as a windbreak near a building
Landscape Windbreak
Seasonal sun path and building orientation diagram
Seasonal Sun Path
Topographic site plan with contours vegetation and access roads
Topographic Site Analysis