California · CSE

California Supplemental Examination

In addition to the Architect Registration Examination (ARE), the California Architects Board requires the California Supplemental Examination (CSE) for licensure. The CSE ensures that candidates can demonstrate minimum standards of competency and the architectural knowledge and skills necessary to respond to California's unique requirements and conditions.

Passed
03/16/23

Study recommendations

  • The exam is 3.5 hours long and contains approximately 130 questions.
  • There are two case studies with approximately 30 questions total, followed by approximately 100 general questions.
  • Time allocation: allow 2 minutes per case-study question and 1.5 minutes per general question.
  • All questions are multiple choice with four choices.
  • The exam does not require you to remember the specific content of codes, regulations, and contracts.

Exam contents (you must know)

01

Contract Development / Project Planning

25%

California Architects Practice Act

  • Standard of care, responsible control, practice requirements, and limitation of liability.

Architect's Services

  • Architectural, structural, mechanical, and electrical services are basic services.
  • Civil, landscape, telecommunications, programming, FF&E, and post-construction evaluation are additional services.

AIA Contracts

  • A101, A201, B101, and C401.
  • Owner, architect, and contractor roles and responsibilities.

Project Team

  • Principal, project manager, job captain, drafter, specification writer, and interior designer.

Project Stages

  • Schematic Design, Design Development, Construction Documents, Bidding and Negotiation, and Construction Administration.

02

Schematic Design / Discretionary Approvals

30%

Programming and Design Solutions

  • Most likely to appear in case-study questions.

Existing Conditions

  • Topographic (above ground), hydrological (water-related), geological (below ground), and climatic conditions, including temperature, humidity, rainfall, and wind.

California Environmental Quality Act

  • Notice of Exemption, Negative Declaration or Mitigated Negative Declaration, and Environmental Impact Report.
  • Public review periods.

California Coastal Act

  • Maximize public access to and along the coast.
  • California Coastal Commission, Local Coastal Program, and Bay Conservation and Development Commission.

California Building Standards Act

  • California Code of Regulations, Title 24.

California Green Building Standards Code

  • Understand mandatory and voluntary measures.
  • Tested extensively.

California Energy Code

  • Understand mandatory requirements.
  • Prescriptive vs. performance approaches.

California Accessibility Regulations

  • California Building Code Chapters 11A and 11B.
  • The local building department reviews California accessibility compliance, not ADA compliance.

Zoning Regulations

  • General Plan vs. Master Plan and Specific Plan.
  • Variance vs. Conditional Use Permit.

Special Building Types

  • Essential service buildings: Essential Services Buildings Seismic Safety Act, enforced by the local building department or DSA.
  • Hospitals: Hospital Seismic Safety Act, enforced by HCAI.
  • Schools: Field Act, enforced by DSA.

03

Design Development

15%

Life-Cycle Cost

  • Initial, installation, operation, maintenance, and replacement costs.

Value Engineering

  • Consider performance, function, aesthetics, and other factors.

Special Conditions

  • Seismic, fire, wind, flood, and hazardous materials.

04

Construction Documents / Permitting

10%

Contract Documents

  • Construction drawings and the project manual, including specifications and general and supplementary conditions.

Bidding

  • Bid RFIs and bid addenda.
  • Allowances, substitutions, and alternates.

Local Agencies

  • Planning Department: entitlements, CEQA, and zoning regulations.
  • Building Department: safety and Title 24 compliance.
  • Fire Department: fire suppression, fire alarms, egress, fire department connections, and fire-truck turnaround.

05

Project Bidding and Construction

20%

Changes During Construction

  • Architect's Supplemental Instruction, Change Order, and Construction Change Directive.

Communication

  • The owner and contractor communicate through the architect; the subcontractor and architect communicate through the contractor.
  • The architect is the default Initial Decision Maker.

Payments

  • The architect signs the application for payment and has the authority to approve the amount believed to be reasonable.

Project Closeout

  • The contractor prepares a punch list, the architect inspects and issues certification of completion, and the owner sends payment.

Lien Laws

  • Design professional lien, mechanics lien, and stop notice.

Statute of Limitations

  • Four years for visible defects and 10 years for hidden defects.